Como Shops

Quick Search

Author
Title
Description
Keyword
 
 
Books Just In
Summer 2008
Milwaukee Road, The Vol 5: Pacific Coast Extension 1941-1961
Strauss


Burlington Northern in Color Vol 3: Green Pastures
Boyd

Wisconsin Central Heritage Vol 2
Leopard


C&NW Color Guide to Freight and Passenger Equipment Vol 1: Passenger Cars, Cabooses and Acquired Roads
Kinkaid

Winter 2007

Milwaukee Road Locos Vol 2
Strauss

BN Vol 2 - A Cascade of Color
Boyd

Great Lakes Ore Docks and Ore Cars
Dorin

Fall 2007

White Pine Industry in Minnesota
Larsen

Twin Cities by Trolleys
Diers, Isaacs

Spokane, Portland and Seattle in Color: Diesels of the Northwest's Own Railway
Austin

 
 
 
CD

Prairie Works


 
Taconite Haulers: On Minnesota's Mesabi Iron Range

Author Name:   N/A

Title:    Taconite Haulers: On Minnesota's Mesabi Iron Range

Book Condition:   CD
Publisher:    Prairie Works

Seller ID:   CD-1007

DVD - 115 minutes The focus of the video is on moving taconite, either as pellets or raw rock, by rail from the mines and processing plants to the docks on Lake Superior at Duluth, Superior, Silver Bay and Taconite Harbor. The Duluth, Missabe & Iron Range Railway is first followed from EVTACís raw taconite loader in Eveleth to the processing plant 10 miles to the south. After a tour of United States Steelís Minntac processing plant, Missabe pellet trains are shown on the line to Duluth with limestone in side-dump cars headed north (some footage from the mid-1980s). After a tour of Proctor Yard, the brake shoe smoke-enshrouded loaded trains are shown headed for the dock. The Missabe is then followed on the scenic line from the Iron Range to Two Harbors and out onto Dock #1. The Burlington Northern/BNSF is next from the three plants it serves to Superior, Wisconsin and beyond with all-rail trains. Cliffs Northshore Miningís railroad operations are viewed from various remote locations to the processing plant at Silver Bay. Also includes photos of predecessor companies Reserve Mining and Cyprus Northshore. The final taconite hauler is Erie Mining/LTV Steel Mining. The tour starts in the mine, on to the mine-to-plant Alco-powered trains, following the pellet trains from the plant on the 72-mile mainline and then out onto the dock at Taconite Harbor. The mainline trains feature EMD F-9s and later power at the end of operations (includes footage of Erie Mining).

Minnesota Mesabi Iron Range Midwest Taconite DVD

Price = 29.95 USD
Add to Shopping Cart
 
<< Prev 1 2 3 4 5 6 7 8 9 10 Next >>     Skip 100 >>
 

 Home  |  About Us  |  Contact Us  |  Store Policies  |  Privacy Policy  |  Links  | 

Questions, comments, or suggestions
Please write to info@comoshops.com

Copyright©2008. All Rights Reserved.